题名

資訊管理專業人員之專案團隊認同與其工作壓力及工作滿足之關係

并列篇名

Job Stress, Job Satisfaction, and Teamwork Identity of MIS Professionals

DOI

10.6226/NTURM2003.14.1.79

作者

葉桂珍(Quey-Jen Yeh);汪美香(Mei-Hsiang Wang)

关键词

專案團隊認同 ; 工作壓力 ; 工作滿足 ; 資管專業人員 ; Project Team Identity ; Job Stress ; Job Satisfaction ; MIS Professionals

期刊名称

臺大管理論叢

卷期/出版年月

14卷1期(2003 / 06 / 01)

页次

79 - 118

内容语文

繁體中文

中文摘要

本文目的在探討資訊管理人員對專案團隊之認同與其工作壓力及工作滿足之關係。研究結果發現,三者的確有顯著關係存在。最主要的,資管人員對專案團隊之認同,包括對團隊之凝聚力、認同感及參與感之認知較高者,其各工作壓力構面也顯著地較低,而同時,也顯著有較高的工作滿足。本文所檢驗的工作壓力包括角色模糊、工作引起的焦慮、角色衝突及工作負荷;工作滿足則包括:同儕滿足、成長滿足、上司督導、待遇滿足及工作穩定。此外,結果也顯示,個人屬性(性別、個人背景與身份)與任務特質(如參與專案閉發階段)對專案成員之團隊認同亦有不同程度的影響。從這些研究結果,我們可推論,藉由提昇資管人員對其所參與專案團隊之認同,可改善他們工作上的壓力及滿意度。

英文摘要

This paper attempts to bridge the MIS professionals' identity of project teams with their stress and satisfaction toward jobs. Significant relationships were found between the three. In particular, those who rated themselves with a more positive perception of their teams over various attitude variables, including team-cohesion, -commitment, and -participation, also rated significantly lower in the various items of job stress and higher in those of job satisfaction. The result also indicates that individual attributes (gender, personal background and status) and task characteristic (i.e., the participating stage) may affect IS professionals' identity of project teams. One may conclude from the current findings that the job- stress and satisfaction of MIS people can be improved through an enhancement of their attitudes toward the IS project teams.

主题分类 基礎與應用科學 > 資訊科學
基礎與應用科學 > 統計
社會科學 > 經濟學
社會科學 > 財金及會計學
社會科學 > 管理學
参考文献
  1. 蔡渭水 Tsai, Wei-Shui、 楊仲偉 Yang, Chung-Wei(2000)。台商自大陸技術移轉模式之研究 The Model of Transfering Technology from Mainland China by Taiwan's Companys。管理評論 Management Review,19(2)
    連結:
  2. Back, K.(1951).Influence through social communication.Journal of Abnormal and Social Psychology,46
  3. Barki, H., Hartwick, J.(1994).Measuring User Participation, User Involvement, and User Attitude.MIS Quarterly: Management Information Systems,18(1)
  4. Baroudi, J. J.(1985).The Impact of Role Variables on IS Personnel Work Attitudes and Intentions.MIS Quarterly,9(4)
  5. Bass, B. M.(1965).Organizational Psychology.Boston, MA:Allen and Bacon.
  6. Beehr, T. A., Newman, J. D.(1979).Personal and organizational strategies for handling job stress: A review of research and opinion.Personal Psychology,32
  7. Blau, P. M., Scott, W. R.(1963).Formal Organizations.London:Routledge Kegan Paul.
  8. Bollen, K. A., Hoyle, R. H.(1990).Perceived cohesion: A conceptual and empirical examination.Social Forces,69
  9. Bubshait, A., Farooq, G.(1999).Team building and project success.Cost Engineering,41
  10. Campion, M. A., Medsker, G. J., Higgs, A. C.(1993).Relations between Work Group Characteristics and Effectiveness: Implications for Designing Effective Work Groups.Personnel Psychology,46
  11. Caplan, R. D., Jones, K. W.(1975).Effects of working load role ambiguity and type a personality on anxiety, depression, and heart rate.Journal of Applied Psychology,60
  12. Carnevale, D. G.(1995).Trustworthy Government: Leadership and Management Strategies for Building Trust and High Performance.San Francisco, CA:Jossey-Bass Publishers.
  13. Carr, D. K., Littman, I. D.(1993).Excellence in Government: Total Quality Management in the 1990s.Arlington, VA:Coopers and Lybrand.
  14. Deming, W. E.(1986).Out of the Crisis.Cambridge, MA:MIT Center for Advanced Engineering Study.
  15. Doll, W. J., Torkzadeh, G.(1991).A congruence construct of user involvement.Decision Sciences,22(2)
  16. Dubinsky, A. J., Hartley, S. W.(1986).A path-analytic study of a model of salesperson performance.Journal of Academy of Marketing Science,14(1)
  17. Evans, N. Y., Jarvis, P. A.(1986).The Group Attitude Scale: A Measure of Attraction to Group.Small Group Behavior,17(2)
  18. Feldman, D. C., Arnold, H. J.(1983).Management Individual and Group Behavior in Organization.N. Y.:McGraw-Hill Co..
  19. Ford, R. C., McLaughlin, F. C.(1992).Successful Project Teams: A Study of MIS Managers.IEEE Transactions on Engineering Management,39(4)
  20. French, J. P., Rodgers, W., Cobb, S.(1974).Coping and Adoption.New York:Basic Books.
  21. French,J.(1962).A Programmatic Approach to Studying the Industrial Environment and Mental Health.Journal of Social Issues,18
  22. George, J. M., Jones, G. R.(1999).Understanding and Managing Organizational Behavior.Addison-Wesley.
  23. Gladstein, D. L.(1984).Groups in Context: A Model of Task Group Effectiveness.Administrative Science Quarterly,29
  24. Goldstein, D. K.(1984).An Examination of Work-Related Correlates of Job Satisfaction in Programmer/ Analysts.MIS Quarterly,8(2)
  25. Gordon, J.(1992).Work teams: How far have they come?.Training,29(10)
  26. Green, G. I.(1989).Perceived Importance of Systems Analysts' Job Skills, Roles, and Non-Salary Incentives.MIS Quarterly,13(2)
  27. Guzzo, R. A., Salas, E.(1995).Team Effectiveness and Decision Making in Organizations.San Francisco, CA:Jossey-Bass Publishers.
  28. Hackman, J. R.(1983).A Normative Model of Work Team Effectiveness.New Haven, CT:Yale University.
  29. Hackman, J. R.(1990).Groups that work and those that don't: Creating conditions for effective teamwork.California, San Francisco:Jossey-Bass, Inc..
  30. Harrington-Mackin, D.(1994).The Team Building Tool Kit: Tips, Tactics, and Rules for Effective Workplace Teams.NY:AMACOM.
  31. Harrison, F. L.(1993).Advanced Project Management.Aldershot Hants, England:Gower.
  32. Harrison, W. L., Farn, C. K.(1990).A Comparison of Information Management Issues in the United States of America and the Republic of China.Information and Management,18(4)
  33. Henderson, J. C., Lee, S.(1992).Managing I/ S design teams: A control theories perspective.Management Science,38(6)
  34. Hendrix, W. H., Steel, R. P., Schultz, S. A.(1987).Job stress and life stress: Their causes and consequences.Journal of Social Behavior and Personality,2
  35. Hoogstraten, J., Vorst, H. C. M.(1978).Group Cohesion, Task Performance, and the Experimenter Expectancy Effect.Human Relations,31
  36. Igbaria, M., Parasuraman, S., Badawy, M.(1994).Work Experiences, Job Involvement,and Quality of Work Life Among Information Systems Personnel.MIS Quarterly,18(2)
  37. Jewell, L. N., Reitz, H. J.(1981).Group Effectiveness in Organizations.Illinois:Scott, Foresman and Company.
  38. Jones, M. C., Harrison, A. W.(1996).IS Project team performance: An empirical assessment.Information & Management,31(2)
  39. Juran, J. M.(1989).Juran on Leadership for Quality: An Executive Handbook.New York:The Free Press.
  40. Kaiser, K., Bostrom, R.(1982).Personality characteristics of MIS design project teams: An empirical study and action-research design.MIS Quarterly,6(4)
  41. Katzenbach, J. R., Smith, D. K.(1993).The discipline of teams.Harvard Business Review,71(2)
  42. Kloppenborg, T. J., Petrick, J. A.(1999).Leadership in project life cycle and team character development.Project Management Journal,30
  43. Kozar, K. A., Zigurs, I.(1992).Human and machine roles in team product reviews.Information and Management,23
  44. Kraut, R. E., Streeter, L. A.(1996).Coordination in Software Development.Communications of the ACM,38(3)
  45. Kroes, W. H., Hurrell, J., Margolis, B. L.(1974).Job stress in police administrators.Journal of Police Science and Administration,2(4)
  46. Levin, J. M., Moreland, R. L.(1990).Progress in small group research.Annual Review of Psychology,46
  47. Lewis, J. P.(1993).How to Build and Manage a Winning Project Team.New York, NY:American Management Association.
  48. Locke, E. A.(1973).Satisfaction and Dissatisfaction among white collar and blue collar employee.Journal of Psychology,58
  49. McFletcher, D.(1996).Teaming by Design: Real Teams for Real People.Chicago, IL:Irwin Professional Publishing.
  50. Mohrman, S. A., Cohen, S. G., Mohrman, Jr. A. M.(1995).Designing team-based organizations: New forms for knowledge work.San Francisco:Jossey-Bass.
  51. Montebllo, A. R., Buzzotta, V. R.(1993).Work Teams That Work.Training and Development Journal,47(3)
  52. Morrow, P. C.(1983).Concept redundancy in organizational research: The case of work commitment.Academy of Management Review,8(3)
  53. Newman, M., Robey, D.(1992).A Social Process Model of User-Analyst Relationships.MIS Quarterly,16(2)
  54. Nunnally, J. C.(1978).Psychometric Theory.New York:McGraw-Hill Book Company.
  55. Porter, L. W., Steers, R. M., Mowday, R. T., Boulian, P. V.(1974).Organizational Commitment, Job Satisfaction and Turnover Among Psychiatric Technicians.Journal of Applied Psychology,59(5)
  56. Price, J. L., Mueller, C. W.(1981).A Causal Model of Turnover for Nurses.Academy of Management Journal,24(3)
  57. Quick, T. L.(1992).Successful Team Building.New York:American Management Association.
  58. Rizzo, J. R., House, R. J., Lirtzman, S. I.(1970).Role Conflict and Ambiguity in Complex Organizations.Administrative Science Quarterly,15
  59. Salas, E., Dickinson, T. L., Converse, S. A., Tannenbaum, S. I.(1992).Teams: Their training and performance.Norwood, NJ:Ablex.
  60. Seashore, S. E., Taber, J. D.(1975).Job satisfaction indicators and their correlation.American Behavior Scientists,18
  61. Shonk, J. H.(1992).Team-Based Organizations: Developing a Successful Team Environment.Homewood, IL:Business One Irwin.
  62. Shonk, J. H.(1982).Working in Teams: A Practical Manual for Improving Work Groups.New York:AMACOM.
  63. Smith, H. D.(1967).A Parsimonious Definition of Group: Toward Conceptual Clarity and Scientific Utility.Sociological Inquiry,37
  64. Smith, P. C., Kendall, L. M., Hulin, C. L.(1969).Management of Satisfaction in Work and Retirement.Chicago:Rent McNally.
  65. Steer, R. M.(1975).Task-goal Attributes, Achievement and Supervisory Performance: A Field Experiment.Organizational Behavior and Human Performance
  66. Stephens, C.(1993).Five CIO's at work: Folklore and facts revisited.Journal of Systems Management,44(3)
  67. Sullivan, S. E., Bhagat, R. S.(1992).Organizational Stress, Job Satisfaction and Job Performance: Where Do We Go From Here?.Journal of Management,18(2)
  68. Sundstrom, E., De Meuse, K. P., Futrell, D.(1990).Work Teams: Applications and Effectiveness.The American Psychologist,45(2)
  69. Turner, S. G., Utley, D. R., Westbrook, J. D.(1998).Project Managers and Functional Managers: A Case Study of Job Satisfaction in a Matrix Organization.Project Management Journal,29(3)
  70. 王文泰(1996)。第七屆國際資訊管理學術研討會
  71. 宋鎧 Sung, Kai、 范錚強 Farn, Cheng-Kiang、 Couger, J. D.(1993)。資訊人員的工作激勵-中美的差異。資訊管理學報 Journal of Information Management,1(1)
  72. 李弘暉 Li, Hung-Hui(1996).High Performance Teams in Public Organizations.資訊管理研究(中央大學) Information Management Research
  73. 李弘暉 Li, Hung-Hui、 鍾麗英 Chung, Ly-Inn(1999)。團隊運作過程對團隊績效影響之研究 The Research on High Performance Teams - The Impacts of Team Process on Team Performance。人力資源學報 Journal of Human Resource Development,11
  74. 李有仁 Li, Eldon Yu-Zen, Shani, A. B.(1991).Stress Dynamics of Information Systems Managers: A Contingency Model.Journal of Management Information Systems,7(4)
  75. 林存德(1998)。MIS完全合作手冊。資訊與電腦雜誌 Information and Computer,219
  76. 林東清 Lin, Tung-Ching(1993)。影響資訊人員工作滿意程度與工作績效的因素分析。人力資源學報 Journal of Human Resource Development,3
  77. 林東清 Lin, Tung-Ching、 孫思源 Sun, Szu-Yuan(1998)。資訊部門人員工作壓力漫談。中華民國資訊經理人協會會務通訊,42
  78. 林震岩 Lin, Jan-Yan、 林詩芳 Lin, Shy-Fang(1995)。第六屆國際資訊管理學術研討會
  79. 侯墐瑜(1994)。資訊管理研究(中央大學) Information Management Research。國立中興大學企業管理研究所。
  80. 施能傑 Shih, Ning-Jay(1993).Job Involvement in a non-western public sector: Its antecedents and consequences.國立政治大學學報 The National Chengchi University Journal,67(下)
  81. 孫思源 Sun, Szu-Yuan、 董和昇 Doong, Her-Sen、 孫培真 Sun, Pei-Chen(1998)。第九屆國際資訊管理學術研討會
  82. 尉謄蛟(1994)。建立團隊十問十答(上)。世界經理文摘 EMBA,89
  83. 張紹勳 Chang, Shao-Shiun(1997)。第八屆國際資訊管理學術研討會
  84. 陳乃明(1987)。資訊管理研究(中央大學) Information Management Research。中原大學企業管理研究所。
  85. 陳海鳴 Chen, Hai-Ming、 胡曉姍(1994)。員工工作配適性程度、工作滿足、工作壓力三者之關係研究。管理與系統 Journal of Management & Systems,1(1)
  86. 陳惠民 Chen, Hui-Ming(1998)。高效率團隊-實務操演手冊。台北:科技圖書股份有限公司。
  87. 曾昆一 、 翁振福(1995)。第六屆國際資訊管理學術研討會
  88. 馮觀富(1992)。壓力、失落的危機處理。心理。
被引用次数
  1. 張庭碩(2017)。臨床護理人員工作壓力及情緒管理對工作績效影響之探討。長榮大學護理學系(所)學位論文。2017。1-115。