题名

A SPARE PART MANAGEMENT MODEL CONSIDERING SERVICE LEVEL AT A NEW PRODUCT LAUNCH STAGE

并列篇名

新品導入階段考慮服務水準之零件備品管理模式

DOI

10.6220/joq.2017.24(4).03

作者

楊康宏(Kang-hung Yang);巫國興(Kuo-Hsing Wu)

关键词

new product launch ; service level ; spare part ; forecasting ; 新產品導入 ; 服務水準 ; 零件備品 ; 預測

期刊名称

品質學報

卷期/出版年月

24卷4期(2017 / 08 / 30)

页次

262 - 279

内容语文

英文

中文摘要

A successful introduction of a new product especially relies on solid customer services at the product launch stage. A company has to be capable of keeping the promised service level so that customers are willing to purchase the new product in the product lifetime. For industrial practices, on-time delivery in returning customers’ defects is the cornerstone of the customer’s loyalty and service quality, which is seriously influenced by available spare parts of the new product. Precise estimations of availability of spare parts in the launch stage are difficult because the new product might have chances to go through Engineering Change or lack of reverent failure data, which makes quantitative forecast models ineffective. This study proposes a solution approach that is combining qualitative and quantitative methods to estimate spare part inventory by different service levels. Also, a case study is provided to justify the applicability of the proposed approach, and scenario analyses are performed to justify the approach.

英文摘要

一個新產品成功的導入有賴於在導入階段客戶的服務品質。公司必須維持所承諾的服務水準讓客戶在未來產品的生命週期內持續購買新產品。在實務上,當新產品有瑕疵時,公司準時送還維修品會影響客戶對產品的忠誠度以及公司的服務品質,而新產品維修備料是否充足是服務品質重要關鍵。在新產品的導入階段要精確的估算維修零件備品有一定的困難度,原因在於新產品有極大的可能將進行變更設計,抑或是無法知道新產品故障類型及故障率,因此,無法有效的使用量化模式估算新產品零件備料的數量。本研究提出一個結合質化及量化的方法估算在不同服務水準下估算新產品零件備品數量的模式。同時,應用一個實務上的案例檢驗本研究模式的可用性,並且應用方案分析進一步檢視此模式在實務上的適用性。

主题分类 社會科學 > 管理學
参考文献
  1. Dutta, S., (accessed December, 2015), 2013, Fixing first-time fix: repairing field service efficiency to enhance customer returns. .
  2. Aly, P, (accessed December, 2015), 2014, Reverse logistics trends in 2014: no longer just the cost of service. .
  3. Butner, K. and Wilterding, M., (accessed December, 2015), 2006, The perfect product launch: innovation drives growth in the consumer products industry. .
  4. Paquin, R., (accessed December, 2015), 2014, NPI velocity in discrete manufacturing: the hidden cost of late products. .
  5. Alonso, J. A.,Lamata , M. T.(2006).Consistency in the analytic hierarchy process: a new approach.International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems,14(4),445-459.
  6. Bowersox, D. J.,Stank ,T. P.,Daugherty, P. J.(1999).Lean launch: managing product introduction risk through response-based logistics.Journal of Product Innovation Management,16(6),557-568.
  7. Dekker, R.,Pince, C.,Zuidwijk, R.,Jalil, M. N.(2013).On the use of installed base information for spare parts logistics: a review of ideas and industry practice.International Journal of Production Economics,143(2),536-545.
  8. Inderfurth, K.,Mukherjee, K.(2008).Decision support for spare parts acquisition in post product life cycle.Central European Journal of Operations Research,16(1),17-42.
  9. Jalil, M. N.,Zuidwijk, R. A.,Fleischmann, M.,Van Nunen, J. A. E. E.(2011).Spare parts logistics and installed base information.Journal of the Operational Research Society,62(3),442-457.
  10. Kumar, V.,Batista, L.,Maull, R.(2011).The impact of operations performance on customer loyalty.Service Science,3(2),158-171.
  11. Lee, H.,Kim, S. G.,Park, H.-W.,Kang, P.(2014).Pre-launch new product demand forecasting using the bass model: a statistical and machine learning-based approach.Technological Forecasting and Social Change,86,49-64.
  12. Mahajan, V.,Sharma, S.(1986).A simple algebraic estimation procedure for innovation diffusion models of new product acceptance.Technological Forecasting and Social Change,30(4),331-345.
  13. Martinez, J. A.,Martinez, L.(2010).Some insights on conceptualizing and measuring service quality.Journal of Retailing and Consumer Services,17(1),29-42.
  14. Millson, M. R.,Wilemon, D.(2006).Driving new product success in the electrical equipment manufacturing industry.Technovation,26(11),1268-1286.
  15. Nenni, M. E.,Schiraldi, M. M.(2013).Optimizing spare parts inventory in shipping industry.International Journal of Engineering and Technology,5(3),3152-3157.
  16. Saaty, T. L.(2000).Fundamentals of Decision Making and Priority Theory with the Analytic Hierarchy Process.Pittsburgh, PA.:RWS.
  17. Thomas, R. J.(1985).Estimating market growth for new products: an analogical diffusion model approach.The Journal of Product Innovation Management,2(1),45-55.
被引用次数
  1. 巫國興(2017)。零件庫存預測與可維修零件補貨模式實證研究。中原大學工業與系統工程學系學位論文。2017。1-143。